Unit 6 Venn PlaceStoke on TrentStaffordhsireST1 3HP
Access was extremely tight, with just two inches of clearance on each side, making repositioning a logistical headache and a potential risk to the surrounding area.
Our tightest squeeze yet: just 9ft of width and low headroom navigating a narrow tunnel in London. Precision container movement captured on drone and completed safely on schedule...
Access to the rear of the site was restricted by a tight bend and a nearby stream, preventing standard delivery. We safely positioned the 40ft container into place with precision.
This delivery involved navigating under a low bridge with limited clearance, alongside a live railway and overhead power lines. The Mover allowed for safe and accurate placement of...