Unit 6 Venn PlaceStoke on TrentStaffordhsireST1 3HP
When a client asked us, “Can you take a container around a lake?” we knew this was exactly the sort of challenge we enjoy.
A modified container was delivered and positioned through a 9ft gap, with a fixed refrigerated unit already in place right next to the access point.
Access was extremely tight, with just two inches of clearance on each side, making repositioning a logistical headache and a potential risk to the surrounding area.
Our tightest squeeze yet: just 9ft of width and low headroom navigating a narrow tunnel in London.
Access to the rear of the site was restricted by a tight bend and a nearby stream, preventing standard delivery.
This delivery involved navigating under a low bridge with limited clearance, alongside a live railway and overhead power lines.